• Toll-free: 1800-313-9272
Our Services
  • Construction of new roads
  • Relaying of asphalt
  • Improvement of old roads
  • Development of layout (that includes earthwork, drains, electric work, landscaping etc)
  • Concrete roads
  • We supply aggregates (M-sand, 6mm, 12mm, 20mm, 40mm, GSB and Wet Mix including transportation)
NH Work

Periodical renewal from 330.00 to 342.00 km of NH-275 Mysore Bangalore section in the state of Karnataka job No: TA-275-KNT-2015-16-546.

Improvement to Ramanagara town limits from km 308.500 to 314.500 of NH-275 (Bantwala-Bangalore section) in the state of Karnataka Bangalore section.

Periodical renewal from km 448.00 to 456.00 of Dindigsal Bangalore section.

Strengthening from km 402.00 to 412.00 to 428.500 of NH-209 DB Section.

Widening to four lane from km 420.80 to 423.50 of Dindigul to Bangalore section (Job. No. 209- KNT-209-583)

Karnataka State Highways Improvement project-2, stage-2- publication of Invitation for bid in the news papers.

Widening of road, construction of RCC drains and other works from Global Village Pattanagere road (km 13.30) to NICE road junction (km 17.80) of NH-275 Bangalore-Mysore section in the state of Karnataka.

Periodical renewal from km 433.500 to 448.000 of NH-209 D-B Section

Widening to four lane from km 468.0 to 469.3220 of NH-209, Dindigul to Bangalore section (Job. No. 209- KNT-2006-463)

Periodical Renewal from km 392.0 to 402.0 of NH-209 Dindigal Bangalore section for the year 2010-11 job No.T.A.209-KNT- 2010-457

BDA Work

Improvement of road between Himalaya drug company on NH-4 and Hurulichikkanahalli up to the approach of housing project at Alur, Dasanapura Hobli, Bangalore North Taluk. (0.00 km to 3.00 km)

Restoration of gas pipeline trench along left side road and left side main carriageway of ORR from km 19.20 to 35.40 and improvements to damaged road surface in balance width along left side service road and left side main carriageway of ORR from km 19.20 to km 35.40 (from Whitefield flyoverr to 14th main of HSR Layout)

Improvement of ORR between Goruguntapalya junction to Nagawara junction (km 0.00 to km | 1.00) package-|

Restoration of gas pipe line trench along left side service road and left side main carriageway between km 0.000 and km 4.750 Of outer ring road and improvements to damaged road surface along main carriageway between km 0.000 and km 2.700 of outer ring road.

Restoration of Sajapura road at St. John's junction and 80 feet road junction.

Providing Asphalting to balance portion of 19th, 27th and 22nd main, |9th and 22nd cross in sector-|, and 2 of HSR Layout and |5th cross in sector-4 of HSR layout.

Providing asphalting to 12.00 meter (40) road below high-tension line between | Oth and | Ith block in further extension of Anjanapura.

Providing drains, construction of culverts, metalling, asphalting and concrete paving of roads in Greenwood Layout, Manjunatha Layout at Haralukunte from Mangammanapalya to Bandepalya road and Somsundara Palya road. Coming under Bommanahalli constituency pertaining to BBMP area (HSR Sub-Division)

Providing re-asphalting to road in AG's Layout,jaladarshini Llayout, AECS Ist and 2nd Stage, Amarjyothi Layout, RMV 2nd Stage, 2nd and 3rd Block.

Judicial Layout, Naidu Layout, KGE Layout, Bande Colony, Geddalahali, A.k. Colony, Majid Area, MLA Lashmanppa Layout, HIG Layout in Sanjayangar Ward No. 100 of Hebbal Constituency.

Restoration of BVVSSB Pipe line trench along left side service road of outer ring road between Whitefield flyover to Central Silk Board junction km 19.60 to 34.10.

Restoration and improvements of LHS and RHS Service road along ORR between Hebbal and Veerannapalya junction.

PWD Work

Improvement of road of Victoria Hospital premises which come under the control of Bangalore Medical College and Research Institute, Bangalore.

Resurfacing of Bangalore - Bannerghatta Anekal road CH 16.80 to 38.50 KM in Anekal Taluk.

29 Improvement of road from Kengeri Kommaghatta Tavarekere road chainage 5.25 km to 8.00 km, 8.00 km to | 1.00 km and | 1.00 km to 14.00 km.

Improvement of Hunasanahalli to Chikkahalli SH-03 from km 0.00 to (TN Border) to km 83.67 (in selected reaches) in Ramanagara District.

Improvement of road from Anekal to Meenakshi Temple via Bannerghatta in Anekal taluk.

Improvement of road from four lane from Coco-Cola factory junction to Horohalli Road (Bidadi Industrial Area) in Ch:3.00 to 7.60 km.

Improvement of road from Mysore Road junction to Coco-Cola factory road (Bidadi Industrial Area) to Four lanes in Ch: 0,00 to 3.00 km. (Balance Work)

Improvement of BMH Road from Magadi Hospete Circle to Someswara Temple circle in Magadi Town limit (51.50 to 52.60km)

Improvement of road from Byalalu to Ist mile stone of Ramohalli Road via Lakashimipura in Bangalore South Taluk.

Improvement of road from Kagalipura to Bannerghatta Road.

Improvement of road from Kagalipura to Bannerghatta road Anekal correspondence.

Improvenment of selected reaches and asphalting to road joining Kanakapura to Gullahatti Rural Road in Kanakapuara Taluk Ramanagara Distict.

Improvement of road from Thavarekatte to join Tamilnadu to Bijjahalli - Gatigunda- Kolagondanahalli in Kanakapura Taluk.

Other Work

We have worked with L&T as a subcontractor for no. of projects. We have done the airport runway as well engaged team that is responsible, reliable and safe.

Improvement and widening of existing road from Mysore Bangalore to Bidadi 2nd phase industrial area, Ramanagara Dist.

Strengthening and widening of road linking Bommasandra industrial area, and Jigani industrial area, (from ch: 700 to 7100 mtrs)

Improvement and widening of existing road from Picchaguntepalya to Vrushabhavathi valley at Bidadi industrial area, 2nd phase, Ramanagara Dist.